"Makhachkala" ship repair process

The ship "Maxachkala" belong to "Uni Tanker Group" LLC was accepted for repair on 20.08.2018, the repair process was completed on 08.09.2018. The ship was lifted on dry land at the "Zig" ship repair plant. During the repair the following works were carried out:

- Repair of both shafts and screws of the ship;

- Measurement of metal thickness on the ship, welding and cutting operations in the body and cargo compartments;

- Repair of head and auxiliary engines, hydraulic mechanisms on board;

- Pressurized water, groundwater treatment and 3-color painting of the ship's hull;

- Diagnosis and repair of ship tube failures;

- Carrying out a basic defect of mechanical, electrical and body sensation of the ship to the appropriate authorities.